MIVOR

YEAR OF CONSTRUCTION 2011/2014 | LATSCH/ITALY 

March 1954: Twelve farmers from Latsch create the „Mittelvinschgauer Obsterzeugergenossenschaft“, short MIVO. The quick success brings on a competing event in 1960: the foundation of the second Latsch association Ortler, named after the highest mountain in South Tyrol. After decades the quite fruitful competition soon gives way to a gradual harmonization, at first 1979 in the form of new, neighboring locations. In 2007 finally the fusion to MIVOR follows. Today the 400 MIVOR members produce about 500 million apples per year on an area of 1,100 hectares. Half of this amount is exported – to a total of 49 countries in Europe, North Africa and Asia.

PROJECT OUTLINE

HIGH-BAY WAREHOUSE FOR FRUIT BINS

  • Galvanized steel rack
  • Silo structure
  • L x W x H: 80 x 25 x 27 m
  • 6 rack aisles
  • Single-deep storage
  • Approx. 18,600 fruit bins
  • Payload: 1,200 kg
  • Climatization: + 2°C

HIGH-BAY WAREHOUSE FOR EMPTY BINS

  • Galvanized steel rack
  • Combination of silo and inhouse structure
  • L x W x H: 80 x 5 x 16 m
  • 1 rack aisle
  • Single-deep storage
  • Approx. 1,650 empty bins
  • Payload: 320 kg

STACKER CRANES IN THE FRUIT BIN WAREHOUSE

  • 6 aisle-bound stacker cranes
  • Single mast construction
  • Driving speed: 180 m/min
  • Driving acceleration: 0.5 m/s2
  • Lifting speed: 40 m/min
  • Lifting acceleration: 0.5m/s2
  • Load handling device: Telescopic fork single-deep

STACKER CRANE IN THE EMPTY BIN WAREHOUSE

  • 1 aisle-bound stacker crane
  • Double mast construction
  • Driving speed: 200 m/min
  • Driving acceleration: 0.7m/s2
  • Lifting speed: 60 m/min
  • Lifting acceleration: 0.7 m/s2
  • Load handling device: 2 telescopic forks single-deep

 CONVEYOR SYSTEM (2011/2014)

over 2 levels including storage and retrieval stations on the ground floor

  • 4 transfer cars on the ground floor (sorting system, packaging)
  • 1 transfer car on the upper floor (high-bay warehouse for fruit bins)
  • 4 vertical lifts
  • 16 fruit dumpers

 SOFTWARE

  • Warehouse management system
  • Visualization
  • Interface to the superior PPS (production planning system)

Download project report

Sie befinden sich auf der Seite "LTWSolution for MIVOR"
URL: http://ltwusa.com/index.php/en/mivor.html